Largest overseas order for ESP

In recent years, the Air Pollution Control business has established several strong references in South East Asia, thanks to its expertise in project execution complemented with increased enforcement of air pollution norms by the Government. A recent feat in this journey was the commissioning of an Electrostatic Precipitator (ESP) for the Sarangani Energy Corporation in the Philippines – a power producing major in South East Asia. This project is the largest overseas installation by Thermax, where the ESP treats flue gas with volumes as high as 0.7 million Am3 /hr emanating from a 410 TPH CFBC boiler to meet the required emission norms. The high point of the project was supplying precisely engineered ESP structure along with a 75 meter tall stack by way of sub assemblies and commissioning the entire edifice at the customer end on time and with no errors while complying with all safety norms. Seamless and cohesive planning, right from engineering to logistics, resulted in appreciation from a delighted customer and proved our capabilities in providing customised solution.

Customer Support
Customer Support
top
Call us
Customer Care
Call us
To Enquire